DAVID EVANS-WOOD

LONG-TERM CARE · LOOK BACK

November 2017: the morning the surveyors stopped taking the tour

As of November 2017. From a corporate seat over a group of buildings, with an administrator's license and the surveys that earned it behind me.

On Tuesday, November 28, the state survey team that walks into any nursing facility in the country will do something no team has done before. It will not take the tour. It will walk past the administrator, past the binders, past the director of nursing waiting at the station, and go straight to the residents, with a tablet, with a list of names it chose before it arrived. The second phase of the 2016 reform of the requirements for participation takes effect the same morning, every F-tag in the book has a new number, and the survey process that every administrator in the country learned to prepare for is gone. I have stood through those surveys as the administrator. This is what the new one looks like from a seat over several buildings, the week before it starts.

What a survey was

A standard survey is the unannounced inspection every certified nursing facility receives at least once every fifteen months, run by the state survey agency on behalf of CMS, against the federal requirements in 42 CFR Part 483. The requirements had not been comprehensively rewritten since 1991. The survey process built on them had two versions in use, the traditional process in most states and the Quality Indicator Survey in some, and both began the same way: the team arrived, met the administrator, and took the tour.

The tour was where a building made its first impression and where most administrators spent their preparation. The surveyors walked the halls with the director of nursing, looked at the dining room at a meal, looked at the call lights, the odors, the med carts, the kitchen. From the tour and from the facility's own data they built a sample of residents to review in depth, and then they went to the paper. Much of a traditional survey was spent in a conference room with charts, and much of an administrator's preparation was spent making sure the charts would hold. The F-tags ran from F150 to the F500s. An administrator who had been through five surveys could recite the numbers that showed up most, F309 for quality of care, F323 for accidents, F314 for pressure ulcers, F441 for infection control, and knew which binder each one lived in.

I prepared for surveys that way as an administrator and I taught administrators to prepare that way after. It was not wrong. A building that is clean at seven in the morning, where the carts are locked and the dining room is quiet and the charts are complete, is a building where the systems are mostly working. But the process rewarded a building for what it looked like on the morning the team walked in, and it let a building that knew the tour was coming put its best hall forward. Every administrator knew which hall that was.

What changed on November 28

On October 4, 2016, CMS published the final rule reforming the requirements for long-term care facilities, at 81 FR 68688, the first comprehensive rewrite of Part 483 in twenty-five years. Because the rule touched nearly every requirement, CMS split it into three phases. Phase 1, the requirements that were unchanged or only lightly modified, took effect November 28, 2016. Phase 2, the requirements facilities needed more time to build, takes effect November 28, 2017. Phase 3, the requirements that need hiring and training and new systems, takes effect November 28, 2019. Phase 2 brings the baseline care plan within forty-eight hours of admission, the antibiotic stewardship program, the facility assessment, the written QAPI plan, behavioral health services, and a long list of revisions underneath those.

CMS chose to launch the new survey process on the same morning as Phase 2, and the two together are the change. The Long-Term Care Survey Process is computer-based. Each surveyor carries a tablet loaded with the facility's own data, and the software builds the team's initial pool of residents before the team arrives, from the MDS, from complaints, from the facility's reported data, with surveyors adding residents they observe on the halls. There is no formal tour. The surveyors go to the residents and to the staff on the first morning, and the sample for in-depth review is built from what they see and hear rather than from what the facility shows them. Each area of concern then runs through a critical element pathway, a structured set of questions the software presents in the same order for every surveyor in every state, so that a pressure ulcer in Texas is investigated the way a pressure ulcer in Ohio is.

Every F-tag was renumbered. The old F150 to F500 range is gone, and the new numbers run from F540 through the F900s, grouped by regulatory section. F309 became F684. F323 became F689. F314 became F686. F441 became F880. The interpretive guidance in Appendix PP was reissued with the new numbers and the new pathways, and CMS put a freeze on the health inspection star ratings on Nursing Home Compare for a year so that surveys under two different processes would not be compared against each other.

CMS also acknowledged how much it was asking. For eighteen months, certain Phase 2 tags will carry a moratorium on the usual remedies, so that a building cited under a brand new requirement is educated rather than fined, and the citation still appears on the record. The agency has said plainly that it expects more citations under the new process, not fewer, because the surveyors will be spending their time with residents instead of with the tour.

What it looks like in the building this month

The buildings I am responsible for have spent the autumn in training, and the training has been about the requirements. Baseline care plans. Antibiotic stewardship. The facility assessment, which most administrators had never written and which asks them to describe, on paper, what their building is and who it serves and what it needs to serve them. That work is real and it is late and it will be done by the 28th, mostly. But the change that worries me is not in the requirements. It is in where the surveyors will be standing.

A team that goes to the residents first goes to whichever hall the software sent it to, and the software does not know which hall the administrator would have chosen. It goes to the resident whose MDS says she has a pressure ulcer, and asks her about it, and asks the aide who turned her last night, and then reads the chart. The chart is still read. But it is read after the surveyor has formed a question, not before, and a chart that is complete in the way an administrator makes a chart complete before a tour is a different thing from a chart that answers a question a resident has already raised.

That is the shift, and it runs underneath every renumbered tag. For twenty-five years a survey measured, in large part, how well a building prepared for a survey. From this month it measures how a building is on a Tuesday, as the residents and the aides on the hall experience it, and the preparation that counts is the kind that happened last March. An administrator who has run a good building has nothing to fear from that and everything to gain, because the tour never showed what she had built. An administrator who has run a good tour is about to find out the difference.

The staff on the halls know this already. The aides have always known which residents would tell the truth to a stranger. What is new is that the stranger is going to ask them first.

What I would tell an administrator this month

Stop preparing for the tour. There is no tour. Walk the building the way the surveyors will, which means start with a resident you did not pick, ask her how her night was, and then go find out whether the chart agrees with her. Do that every week and the survey takes care of itself.

Learn the new numbers, but learn the pathways better. The critical element pathways are public. They are the questions the surveyor will be reading off the tablet, in order, and a director of nursing who has read the pressure ulcer pathway knows exactly what will be asked about the resident in room twelve before the team arrives.

Write the facility assessment yourself. Do not buy a template and fill in the blanks, because the assessment is the document the surveyor will hold up against your staffing, and a template that says you can care for ventilator residents when you cannot is a citation waiting to be written.

Use the eighteen months. The moratorium on remedies for the new Phase 2 tags is CMS telling you it knows these are new. A citation during that window costs you nothing but the lesson, and the lesson is cheaper now than it will be in 2019.

And tell the aides what is coming. They are the first people the surveyors will talk to from now on, and an aide who knows that and knows that the truth is what the building wants from her is the best preparation a facility can have.

Afterword, written November 2017

Phase 3 arrived on November 28, 2019, with the compliance and ethics program, the infection preventionist, the trauma-informed care requirements and the rest, and then the pandemic arrived four months later and surveys stopped being standard surveys for the better part of two years. When CMS caught up, it did so in guidance rather than in rule. On June 29, 2022, it issued QSO-22-19-NH, the long-delayed interpretive guidance for Phase 3 together with significant revisions across Appendix PP, effective October 24, 2022. On November 18, 2024, it issued another round of significant revisions, first set for February 24, 2025, then delayed to March 24, and finally, in QSO-25-14-NH, to April 28, 2025, with new guidance on admission agreements, nursing services and payroll-based staffing data among the changes. The pathways on the tablets changed with each round. The process did not.

Then, nine years after the tour ended, CMS changed the process again, in the other direction. On July 16, 2026, it issued QSO-26-14-NH, and on September 8, 2026, the Risk-Based Survey went nationwide. Facilities that meet a set of quality criteria and carry none of eleven disqualifiers now receive a shorter, more focused recertification survey, with a smaller team and roughly half the time on site, while the full Long-Term Care Survey Process is reserved for the buildings where the risk is. The memo is candid about why. The federal survey budget has not increased since 2015 and the complaint workload at the state agencies is up by more than twenty percent over the same period, and something had to give. Qualifying facilities carry a high performing icon on Care Compare from September 30, 2026. The fifteen-month standard survey remains, and a state can run the full process at any qualifying building when it sees a reason.

The building that earns the short survey in 2026 is the building that did what I asked administrators to do in 2017. It stopped preparing for the tour and started being, on a Tuesday, the place the surveyors would find on any Tuesday. The 2017 process made that the only thing that counted. The 2026 process pays for it with time.

Written November 2017.

Sources

Federal Register, Medicare and Medicaid Programs. Reform of Requirements for Long-Term Care Facilities, 81 FR 68688, October 4, 2016, for the rule and the three implementation dates. CMS, S&C 17-36-NH, Revision to State Operations Manual Appendix PP for Phase 2, June 30, 2017, for the Phase 2 guidance, the new survey process launching with it, and the star rating freeze. CMS, S&C 18-04-NH, Temporary Enforcement Delays for Certain Phase 2 F-Tags, November 24, 2017, for the eighteen-month moratorium on remedies. HHS, Nursing Homes guidance page, for the 2017 launch of the Long-Term Care Survey Process. CMS, QSO-25-14-NH, Revised Long-Term Care Surveyor Guidance, March 10, 2025, for the April 28, 2025 implementation and the delays before it. CMS, QSO-26-14-NH, Nursing Home Risk-Based Survey National Implementation, July 16, 2026, for the September 8, 2026 launch, the high performing icon and the fifteen-month standard. QSO-22-19-NH, June 29, 2022, for the Phase 3 guidance effective October 24, 2022. The F-tag crosswalk figures are from Appendix PP as reissued in 2017. The account of the tour and the administrator's preparation is the author's own.