DAVID EVANS-WOOD

LONG-TERM CARE · LOOK BACK

December 2025: the week the nursing facility was offered the other half of its census

As of December 2025. From the seat of someone running an institutional special needs plan inside a skilled nursing operator.

On December 18 the CMS Innovation Center announced the Long-term Enhanced ACO Design Model, which it calls LEAD, as the successor to ACO REACH when REACH ends at the close of 2026. LEAD will run ten years, from January 1, 2027 through December 31, 2036, the longest model test the Innovation Center has ever proposed. For most of the industry that is a headline about accountable care organizations. For a nursing facility operator that already runs an institutional special needs plan, it is something else. It is the first time a single clinical model in the building could be paid for keeping every resident well, the Medicare Advantage half of the census through the plan and the traditional Medicare half through the ACO, and I have spent the week since the announcement working out what that means.

What an institutional special needs plan is

An institutional special needs plan is a Medicare Advantage plan that may enroll only people who live in, or are expected to need for ninety days or more, the level of care a nursing facility provides. It is written into the Medicare Managed Care Manual, chapter 16b, as one of three kinds of special needs plan, and it carries a required model of care, approved by CMS, that says how the plan will manage the health of people who are by definition frail, chronically ill and living in a building full of other people like them. Most such plans are owned by insurers. A growing number are owned or sponsored by the nursing facility operators themselves, and that ownership is the point.

The piece before this one described what Medicare Advantage looks like to a facility from the outside: a reviewer on a telephone deciding when a stay ends, paid by the day it is not delivered. An I-SNP turns that around. The plan is paid a capitated amount each month for every enrolled resident, risk-adjusted for how sick she is, and it keeps what it does not spend on hospitals. The clinical model that makes that work is a nurse practitioner, employed by or contracted to the plan, in the building, seeing residents on rounds, catching the urinary tract infection before it becomes sepsis, treating the pneumonia in the bed instead of the emergency room, and writing the orders that a floor nurse would otherwise have to reach an off-site physician to get. The plan is rewarded when the resident stays well and stays home. The facility is rewarded when the plan is. For the first time in my career, the entity reviewing the care and the entity delivering it want the same thing.

I run one. The operator I work for stood up its plan with a partner that holds the license and the actuarial risk, and I have spent the last two years inside the implementation, which is a longer story than this piece. The short version is that it works, that it is hard, and that it covers only the residents who enroll. A long-term resident on traditional Medicare, who has chosen not to join a plan or whose family has not been asked, is outside it. In most buildings that is a large share of the census, and until this week there was no good way to bring that share under the same clinical model with the same incentives.

What CMS announced on December 18

LEAD is a voluntary accountable care organization model, and it keeps the architecture that has defined Medicare accountable care since Direct Contracting in 2021 and REACH in 2023: two-sided risk, prospective population-based payment, and a benchmark against which the organization's spending is measured. What it changes is the three things the sector has complained about since the first high-needs track opened.

The first is rebasing. Under the Shared Savings Program and its successors, an organization that saved money watched its own savings lowered into its next benchmark, so that success shrank the opportunity that had motivated it. Participants called it the ratchet. LEAD builds its benchmark from a fixed three-year baseline, 2024 through 2026, and does not rebase it against the organization's own performance. An organization that reduces spending in year two keeps the gap in year three, and the gap can widen, which CMS calls the savings wedge. After five years the benchmark begins a transition toward a regional rate book, but the ratchet is gone.

The second is eligibility for the complex population. Under REACH the high-needs track had its own criteria, and analysis of those criteria found that more than thirty percent of long-stay nursing facility residents failed to qualify in practice, leaving the most clinically complex people in the country outside the structure built for them. LEAD applies high-needs benchmarking, concurrent risk adjustment and a dedicated trend to complex beneficiaries at the individual level, inside the same ACO as everyone else, so that an organization serving an institutionalized population can align its whole attributable fee-for-service census to one structure.

The third is who was left out. LEAD is written to bring in the organizations earlier models discouraged: smaller and rural practices, federally qualified health centers, rural health clinics, and the providers who care for dually eligible, homebound and institutionalized beneficiaries. The Global option carries a benchmark discount in the range of one and three quarters to three percent, softer than REACH's flat three. The Professional option shares savings and losses at fifty percent with no discount at all. There are risk corridors, an optional stop-loss, and a new capitated payment for non-primary care services that can finance downstream relationships with specialists and post-acute facilities. It is, in every design choice I can see, a model built for the nursing facility to join.

What the two make together

Walk any long-term care hall and the residents fall into two groups by the card in the chart. Some are in Medicare Advantage, and if the facility sponsors an I-SNP, some of those are in the facility's own plan. The rest are in traditional Medicare, and their care is paid for by claims, day by day, test by test, with no one accountable for the total and no one paid to keep them out of the hospital. Today the nurse practitioner on rounds treats both groups the same way, because that is what a good clinician does. Only one group's outcomes are measured and paid for.

LEAD closes that gap from the other side. An ACO that aligns the facility's traditional Medicare residents, with the high-needs benchmarking that LEAD now applies at the individual level, is accountable for exactly what the I-SNP is accountable for: hospitalizations avoided, emergency visits avoided, total cost of care against a benchmark, quality measured and reported. The same nurse practitioner, the same model of care, the same rounds, the same early intervention, now produce a measured result for the whole hall. One clinical model. Two payment structures. The I-SNP covers the residents who enroll, and LEAD covers the ones who do not, and an operator that has built the clinical infrastructure for the first is most of the way to the second.

That is what the sector has been missing, and the numbers behind the fragmentation say why. More than three quarters of nursing facilities serve long-stay populations aligned to two or more different ACOs, nearly half to three or more, and roughly seventy percent of the long-term care nursing facility population is aligned to no ACO at all. A building with residents spread across three ACOs it does not control has three sets of care managers calling, three sets of data requests, and no one who can change what happens on the hall. A building that aligns its own census to its own ACO has one. The I-SNP taught operators like mine what it means to be accountable for a resident. LEAD is the invitation to be accountable for all of them.

What I am watching

The request for applications. The announcement is a framework, and the document that will say what an applicant has to show, how beneficiaries will be aligned, what the minimum alignment is, and how the high-needs methodology works in practice is still to come. CMS has said that current REACH participants in good standing will get an abbreviated application, which tells me the agency wants continuity more than it wants new entrants, and that a nursing facility operator coming in cold will need to look like an organization that can run an ACO for ten years.

The financial guarantee. Every model since Direct Contracting has required one, in the form of a surety bond, an escrow or a line of credit sized to a share of the benchmark, and it has to be in place before the first performance year begins. For an operator whose balance sheet is buildings and payroll, the guarantee is the first real conversation with the board, and I would rather have it in January than in November.

The people. An I-SNP runs on nurse practitioners and the care managers behind them, and LEAD will run on the same people covering more residents. The constraint on whole-census accountable care in a nursing facility is not the payment model. It is the number of clinicians willing to work in a building, and the operators that will do well in 2027 are hiring in 2026.

And the board. A ten-year model with downside risk is not a pilot, and the first performance year carries a two percent benchmark reduction for an organization that leaves after it. An operator that goes in has to go in to stay, and the case for that has to be made in the plain terms an operating board understands: what the hall looks like now, what it will look like with one clinical model over the whole census, and what it costs to get there.

What I would tell an administrator this month

Count your census by payer and then by who is accountable for it. The residents in the facility's own plan have someone paid to keep them well. The residents in another insurer's plan have someone paid to shorten their stay. The residents in traditional Medicare have no one. Write those three numbers on one page and keep it, because by 2027 the third number is the one you will be asked about.

If your operator runs an I-SNP, learn how the model of care works on your hall before anyone asks you to extend it. Ride with the nurse practitioner. Read the care management notes. The ACO, if it comes, will be built on that, and the administrator who already knows it will be the one asked to lead it.

If your operator does not run one, ask why, and listen to the answer, because the answer is usually that it is hard, and it is, and the operators who did the hard thing three years ago are the ones CMS just wrote a ten-year model for.

And do not wait for the request for applications to start the conversation with your medical director and your director of nursing about what whole-census accountability would ask of them. The model is coming either way. The question is whether the building is on the inside of it or being managed from the outside by someone else's ACO.

Afterword, written December 2025

The request for applications came on March 31, 2026, and the application portal for the first performance year closed on May 17. CMS invited non-binding letters of interest by April 20 from organizations considering later cohorts, and it has said it will use that interest to decide whether and when later application cycles open. Organizations accepted for 2027 were offered an implementation period from September 15 through December 31, 2026, during which they may conduct voluntary alignment activities ahead of the alignment minimums that apply on January 1, though no beneficiaries are aligned during the implementation period itself. The financial guarantee has to be in place by December 31. The first performance year begins the next morning.

The design held up on the page. The historical benchmark with no rebasing, the high-needs treatment at the individual level, the three beneficiary categories each with its own trend and risk adjustment, the softer discount for Global and no discount for Professional, the new non-primary care capitation that is a true capitated payment rather than a reconciled advance. I wrote the full account of the model in July, and it stands as the reference on this site. What the page cannot tell you is what the first alignment season felt like inside an operator, which is the subject of a piece I will write when the year is over and the numbers are in.

The thesis has not changed. The I-SNP and LEAD are not competing strategies. They are two halves of a whole-census accountable care strategy, in which the same nurse practitioner on the same rounds is paid, through two structures, for the outcome of every resident on the hall. The operators who built the first half when it was hard are the ones who can take the second half now, and 2027 is the year the sector finds out how many of them will.

Written December 2025.

Sources

CMS Innovation Center, Long-term Enhanced ACO Design (LEAD) Model, announcement of December 18, 2025, request for applications of March 31, 2026, and the model's web pages, for the ten-year performance period, the risk options, the benchmark methodology, the application and implementation dates and the financial guarantee. CMS, Medicare Managed Care Manual, chapter 16b, Special Needs Plans, for the institutional special needs plan eligibility and model of care requirements. David Evans-Wood, One Care Model, Two Payment Structures: LEAD, I-SNPs, and the Future of the SNF Population, July 10, 2026, the author's full account of the model, which this piece draws on for the REACH high-needs eligibility analysis and the alignment fragmentation figures, each cited there to its source. The account of running an institutional special needs plan is the author's own. The operator and its plan partner are not named.